Electromechanical Assembly:

  • Logistic;
  • Approved and trained equipment;
  • Mobilization;
  • Elevation, transportation;
  • Benches and dedicated tools;
  • Mobile workshops;
  • Mobile offices;
  • Dedicated measurement equipment;
  • Senior Managers, work budgets and controllers;
  • Software specialist;
  • Control systems;
  • Control of parts and materials;
  • Tool control;
  • Specialized Schedule;
  • Management tools dedicated to the construction of works;
  • HSE, HR and DP.
 

Pequeno porte Small Assembly:

45 construction works
Up to: 50 DL (Direct Labor)
Duration of 1 to 6 months.
 

Médio porte Assembly of Medium Size:

35 construction works
Up to: 100 DL (Direct Labor)
Average duration of from 4 to 12 months.
 

Grande porteLarge Assembly:

19 construction works
Greater than: 100 DL (Direct Labor)
Average duration of 6 to 20 months.