Skip to content
Authomathika

History

Timeline

Milestones in Authomathika's evolution since 1999.

27+
Years in the market
250+
Projects delivered
892 MW
Solar energy installed
5 countries
Countries with projects
Legend:FoundationMilestoneProjectsAwardExpansionInternational
Foundation
1999

Founding of Authomathika in Sertãozinho, SP

Beginning operations as an electrical systems and industrial automation integrator

Sugarcane & Energy
Projects
2003

Expansion into thermoelectric and cogeneration plants

First complete automation projects in cogeneration plants

Sugarcane & EnergyEnergy
Milestone
2005

Expansion of Sugarcane-Energy projects

Quality management system implemented across all processes

Sugarcane & EnergySanitationFertilizers
Projects
2008

Four simultaneous greenfield projects

São Martinho — Boa Vista

Automação termoelétrica e etanol — 4.500 pontos

Da Mata

Automação etanol e levedura — 2.000 pontos

Ipê

Automação etanol — 1.800 pontos

Sugarcane & Energy
Projects
2009

Major cogeneration plants in the Midwest

Rio Claro

Automação termoelétrica e etanol — 4.500 pontos

Santa Luzia

Automação e cogeração — 4.500 pontos

Sugarcane & EnergyEnergy
Projects
2011

Four simultaneous projects — multisector expansion

Água Emendada

Automação termoelétrica e etanol — 3.800 pontos

Alto Taquari

Automação termoelétrica e etanol — 3.800 pontos

Conquista do Pontal

Automação cogeração — 1.300 pontos

GS Inima — ETE Caiçara

Automação e elétrica — 1.100 pontos

Sugarcane & EnergySanitation
Award
2012

Supplier Excellence Award and fertilizer expansion

SESAMM

ETE Mogi Mirim — automação, civil e elétrica — 1.500 pontos

Mosaic Fertilizantes

Área U-830 dosagem microgranulado — 520 pontos

Sugarcane & EnergySanitationFertilizers
Expansion
2013

Entry into logistics sector — LOGUM ethanol pipelines

LOGUM — Ribeirão Preto

Automação terminal etanol — 7.300 pontos

LOGUM — Etanolduto

Automação, elétrica e civil greenfield — 1.000 pontos

LogisticsFertilizers
International
2014

First international project — Angola + record 18 projects

Largest volume of simultaneous projects at the time: Vale (3 plants), Biocom Angola and logistics expansion.

Biocom — Angola

Automação greenfield turnkey completo — 6.000 pontos

Vale

3 plantas simultâneas: U-280, U-260 e U-170 — 8.490 pontos

LOGUM Uberaba

Terminal de recebimento e armazenamento — 8.500 pontos

Santa Isabel I

Automação açúcar e etanol — 1.100 pontos

FertilizersSugarcane & EnergyLogisticsInternational
Projects
2016

15 MW thermoelectric plant, STP and Bunge cycle expansion

Sugarcane & EnergySanitationFertilizers
International
2017

Operations in Panama — second country served

Cadasa — Panamá

Automação e elétrica termoelétrica 40 MVA + eletrificação de moenda

Mosaic / Vale — CMA e CIU

Instrumentação e válvulas — paradas programadas

Sugarcane & EnergyFertilizersInternational
Projects
2018

Historical record — 20 simultaneous projects

Largest volume of operations in company history. Bunge (3 units), São Martinho, Mosaic and first large-scale EPC projects.

Bunge Moema / Itatinge / Fruto

Revamp completo automação — 3 unidades simultâneas

ISAPA

Projeto EPC — ampliação completa

Sada Bioenergia

Fábrica de açúcar completa — 1.500 pontos

Aroeira / Caldema

Automação e elétrica de caldeira

Sugarcane & EnergyFertilizersSanitationFood & Beverage
Milestone
2019

Operational safety milestone consolidated

Operational safety excellence recognized. 18 projects delivered: São Martinho, FS Bioenergia and sanitation expansion.

São Martinho — Iracema (×2)

Fermentação e Mix Etanol

FS Bioenergia (×2)

Lins e Sorriso

GRASP

Secador de levedura

GS Inima Samar

ETA I e II — Araçatuba

Sugarcane & EnergySanitationFertilizers
Projects
2020

12 projects delivered during the pandemic

Jalles Machado

Moenda + tratamento de caldo + CDA + destilaria — 1.200 pontos

Vale do Paraná — UTE VDPA

Automação e instrumentação caldeira — 1.200 pontos

Cerradinho Bio

Automação fermentação e montagem de campo — 800 pontos

Sugarcane & EnergyEnergyFood & Beverage
Projects
2021

Solar segment expansion

Largest solar project executed to date, in partnership with Grupo Cobra. São Martinho (4 units), Mosaic (3 units) and Adimax simultaneously.

UFV Belmonte I & II — Grupo Cobra

Montagem eletro-civil 300 MW — São José do Belmonte, PE

São Martinho (×4)

Iracema, Santa Cruz, Pradópolis e Boa Vista

Mosaic / Vale (×3)

Campo Grande e Uberlândia

Adimax — Feira de Santana

Planta greenfield alimentos — 1.000 pontos

SolarSugarcane & EnergyFertilizersFood & Beverage
Projects
2022

14 projects — food, soy and sugarcane-energy

Serra Verde — Boa Vista, RR

Planta greenfield extração e refino de óleo de soja — 800 pontos

Sugarcane & EnergyFood & BeverageFertilizers
Expansion
2023

UFV São José do Belmonte 300 MW and industrial biogas

Grupo Cobra — UFV São José do Belmonte I & II

Montagem eletro-civil 300 MW — Pernambuco

Combio / Ingredion

Elétrica e automação — biogás industrial — 1.500 pontos

SolarFood & BeverageFertilizers
Expansion
2025

UFV Lins I & II — 207 MW in Ceará

Grupo Cobra — UFV Mundo Novo Lins I & II

Montagem eletromecânica 207 MW — São Gonçalo do Amarante, CE

Solar
Expansion
2026

UFV Lins III–VIII — 230 MW in Piauí — in progress

Authomathika's largest solar project in progress. Cristino Castro, PI.

Grupo Cobra — UFV Lins III–VIII

Montagem eletromecânica 230 MW — Cristino Castro, PI

Solar
Continuously growing
Timeline | Authomathika