Direct answer
An industrial electrical panel is an enclosure that groups protection, switching, control and monitoring devices for a part of the plant. The main types are MV cubicles, LV switchboards, MCCs, control and automation panels, and e-houses. Each has a distinct role in distributing and controlling power. Authomathika builds custom industrial panels.
Institutional content: Authomathika
Published:
An industrial plant moves energy from the utility connection to motors, drives, instruments and control systems. Electrical panels are the points where that energy is divided, protected, switched and monitored. Knowing which panel does what makes it much easier to read a single-line diagram, write a scope and compare proposals.
What is an industrial electrical panel and what is it for?
An industrial electrical panel is an enclosure that houses protection, switching, measurement, control or automation devices for a circuit, a machine or an entire area of a plant. Its job is to distribute power safely, protect people and equipment, and let operators and control systems command the process.
A panel is more than a metal box. It combines an enclosure, busbars or wiring, devices, terminals, labeling and documentation, built to a defined design. Panels are typically built to a recognized standard, such as the IEC 61439 series for low voltage assemblies. Always consult the current edition and the requirements of your project.
What are the main types of industrial panels?
The main types are medium voltage cubicles, low voltage main switchboards (QGBT in Brazilian practice), motor control centers (MCC), control and automation panels, and e-houses. Each one sits at a different level of the power and control hierarchy.
| Type | What it is | Typical function |
|---|---|---|
| MV cubicle | Medium voltage switchgear section | Receives and distributes power at medium voltage, with switching and protection |
| LV main switchboard (QGBT) | Low voltage main distribution assembly | Receives power from transformers and feeds MCCs and distribution boards |
| MCC | Motor control center, a lineup of withdrawable or fixed units | Starts, protects and controls motors and other loads |
| Control and automation panel | Enclosure with PLC, I/O, power supplies and network devices | Runs process logic and connects field instruments |
| E-house | Prefabricated electrical room that houses several panels | Delivers switchgear, MCCs and control equipment tested and ready to install |
An e-house is a prefabricated building or skid that holds panels together with its own lighting, HVAC and cable management, so that much of the integration happens in the factory instead of on site.
How does each panel fit into the plant's power distribution?
Power flows downward: medium voltage cubicles feed transformers, transformers feed the low voltage main switchboard, and the switchboard feeds MCCs, distribution boards and automation panels. Each step reduces voltage or splits circuits, with protection at every level.
- The incoming line reaches the medium voltage cubicles, which isolate and protect the plant supply.
- Transformers step the voltage down to the low voltage level used by the plant.
- The main switchboard collects the low voltage supply and distributes it to feeders.
- MCCs and distribution boards supply motors, process loads and auxiliary services.
- Control and automation panels receive their own supply and command the loads through signals and networks.
In large installations these items are often grouped in an e-house near the process area, which shortens cable runs and concentrates the electrical equipment in a controlled environment. Authomathika's electrical solutions cover this kind of distribution in industrial and building plants.
What changes between power, control and automation panels?
Power panels carry and switch high currents, control panels command devices with relatively simple logic, and automation panels run programmable logic and communicate with the rest of the plant. The design priorities differ in each case.
| Aspect | Power panels | Control panels | Automation panels |
|---|---|---|---|
| Main concern | Short circuit withstand, thermal behavior, selectivity | Command circuits, interlocks, safety functions | I/O count, networks, power supplies, signal integrity |
| Typical devices | Breakers, contactors, busbars, drives | Relays, push buttons, selector switches, timers | PLC, remote I/O, switches, converters |
| Key documents | Single-line diagram, short circuit and selectivity studies | Schematic diagrams, wiring lists | Schematics, I/O list, network architecture |
The boundaries blur in practice. An MCC unit may include control relays and a communication interface, and an automation panel may contain motor starters. What matters is that the scope states which panel owns each function. For the automation side, see what an industrial automation panel is and when you need one.
What stages make up design, manufacturing, testing and delivery?
A panel project moves from requirements and design to manufacturing, factory testing, delivery, site testing and documentation. Each stage should produce a defined deliverable and have a clear owner.
| Stage | Deliverable | Usually led by |
|---|---|---|
| Requirements and design | Single-line diagram, schematics, layout, bill of materials | Engineering |
| Manufacturing | Assembled panel, wiring, labeling | Panel shop |
| Factory acceptance test (FAT) | Test record, punch list | Manufacturer with the customer |
| Delivery and installation | Panel set in place, cables terminated | Installation team |
| Site acceptance test (SAT) | Commissioning record | Contractor with the customer |
| Documentation | As-built pack | Engineering |
The details of each stage are covered in industrial panel design: stages and deliverables and in panel acceptance tests: FAT, SAT and what to record. Keeping the as-built documentation current is what lets maintenance teams work safely later.
Where should you start when specifying panels?
Start from the loads and the single-line diagram, then define the environment, the standards and the interfaces. A clear set of inputs lets suppliers quote the same scope and makes proposals comparable.
Gather these data before requesting a proposal:
- Single-line diagram or, at least, a list of loads with power and type of starting.
- Supply voltage, frequency and available short circuit level at the point of connection.
- Installation environment: indoor or outdoor, dust, humidity, corrosive atmosphere, temperature range.
- Applicable standards and plant requirements, such as ABNT NBR 5410, ABNT NBR 14039 and the IEC 61439 series, in their current editions.
- Control interfaces: PLC, networks, field instruments and expected signals.
- Expected expansion, so that spare space and capacity are planned.
- Required tests, documentation and delivery format.
Criteria for choosing a supplier include the quality of the technical documentation, the clarity of the scope, the test plan and the ability to support the panel after delivery. Our guide on what to ask for in an industrial electrical design proposal turns this into a checklist.
Authomathika, an integrator of electrical systems, automation and industrial assembly founded in 1999, offers custom industrial electrical panels. Services and products are evaluated by scope and budget, and you can reach the team through the quote request page.