Industrial Electrical Panels: Types, Functions and How They Work

Learn the main types of industrial electrical panels, MCC, LV switchboards, automation panels, MV cubicles and e-houses, and how to start specifying them.

Direct answer

An industrial electrical panel is an enclosure that groups protection, switching, control and monitoring devices for a part of the plant. The main types are MV cubicles, LV switchboards, MCCs, control and automation panels, and e-houses. Each has a distinct role in distributing and controlling power. Authomathika builds custom industrial panels.

Institutional content: Authomathika

Published:

An industrial plant moves energy from the utility connection to motors, drives, instruments and control systems. Electrical panels are the points where that energy is divided, protected, switched and monitored. Knowing which panel does what makes it much easier to read a single-line diagram, write a scope and compare proposals.

What is an industrial electrical panel and what is it for?

An industrial electrical panel is an enclosure that houses protection, switching, measurement, control or automation devices for a circuit, a machine or an entire area of a plant. Its job is to distribute power safely, protect people and equipment, and let operators and control systems command the process.

A panel is more than a metal box. It combines an enclosure, busbars or wiring, devices, terminals, labeling and documentation, built to a defined design. Panels are typically built to a recognized standard, such as the IEC 61439 series for low voltage assemblies. Always consult the current edition and the requirements of your project.

What are the main types of industrial panels?

The main types are medium voltage cubicles, low voltage main switchboards (QGBT in Brazilian practice), motor control centers (MCC), control and automation panels, and e-houses. Each one sits at a different level of the power and control hierarchy.

TypeWhat it isTypical function
MV cubicleMedium voltage switchgear sectionReceives and distributes power at medium voltage, with switching and protection
LV main switchboard (QGBT)Low voltage main distribution assemblyReceives power from transformers and feeds MCCs and distribution boards
MCCMotor control center, a lineup of withdrawable or fixed unitsStarts, protects and controls motors and other loads
Control and automation panelEnclosure with PLC, I/O, power supplies and network devicesRuns process logic and connects field instruments
E-housePrefabricated electrical room that houses several panelsDelivers switchgear, MCCs and control equipment tested and ready to install

An e-house is a prefabricated building or skid that holds panels together with its own lighting, HVAC and cable management, so that much of the integration happens in the factory instead of on site.

How does each panel fit into the plant's power distribution?

Power flows downward: medium voltage cubicles feed transformers, transformers feed the low voltage main switchboard, and the switchboard feeds MCCs, distribution boards and automation panels. Each step reduces voltage or splits circuits, with protection at every level.

  1. The incoming line reaches the medium voltage cubicles, which isolate and protect the plant supply.
  2. Transformers step the voltage down to the low voltage level used by the plant.
  3. The main switchboard collects the low voltage supply and distributes it to feeders.
  4. MCCs and distribution boards supply motors, process loads and auxiliary services.
  5. Control and automation panels receive their own supply and command the loads through signals and networks.

In large installations these items are often grouped in an e-house near the process area, which shortens cable runs and concentrates the electrical equipment in a controlled environment. Authomathika's electrical solutions cover this kind of distribution in industrial and building plants.

What changes between power, control and automation panels?

Power panels carry and switch high currents, control panels command devices with relatively simple logic, and automation panels run programmable logic and communicate with the rest of the plant. The design priorities differ in each case.

AspectPower panelsControl panelsAutomation panels
Main concernShort circuit withstand, thermal behavior, selectivityCommand circuits, interlocks, safety functionsI/O count, networks, power supplies, signal integrity
Typical devicesBreakers, contactors, busbars, drivesRelays, push buttons, selector switches, timersPLC, remote I/O, switches, converters
Key documentsSingle-line diagram, short circuit and selectivity studiesSchematic diagrams, wiring listsSchematics, I/O list, network architecture

The boundaries blur in practice. An MCC unit may include control relays and a communication interface, and an automation panel may contain motor starters. What matters is that the scope states which panel owns each function. For the automation side, see what an industrial automation panel is and when you need one.

What stages make up design, manufacturing, testing and delivery?

A panel project moves from requirements and design to manufacturing, factory testing, delivery, site testing and documentation. Each stage should produce a defined deliverable and have a clear owner.

StageDeliverableUsually led by
Requirements and designSingle-line diagram, schematics, layout, bill of materialsEngineering
ManufacturingAssembled panel, wiring, labelingPanel shop
Factory acceptance test (FAT)Test record, punch listManufacturer with the customer
Delivery and installationPanel set in place, cables terminatedInstallation team
Site acceptance test (SAT)Commissioning recordContractor with the customer
DocumentationAs-built packEngineering

The details of each stage are covered in industrial panel design: stages and deliverables and in panel acceptance tests: FAT, SAT and what to record. Keeping the as-built documentation current is what lets maintenance teams work safely later.

Where should you start when specifying panels?

Start from the loads and the single-line diagram, then define the environment, the standards and the interfaces. A clear set of inputs lets suppliers quote the same scope and makes proposals comparable.

Gather these data before requesting a proposal:

  1. Single-line diagram or, at least, a list of loads with power and type of starting.
  2. Supply voltage, frequency and available short circuit level at the point of connection.
  3. Installation environment: indoor or outdoor, dust, humidity, corrosive atmosphere, temperature range.
  4. Applicable standards and plant requirements, such as ABNT NBR 5410, ABNT NBR 14039 and the IEC 61439 series, in their current editions.
  5. Control interfaces: PLC, networks, field instruments and expected signals.
  6. Expected expansion, so that spare space and capacity are planned.
  7. Required tests, documentation and delivery format.

Criteria for choosing a supplier include the quality of the technical documentation, the clarity of the scope, the test plan and the ability to support the panel after delivery. Our guide on what to ask for in an industrial electrical design proposal turns this into a checklist.

Authomathika, an integrator of electrical systems, automation and industrial assembly founded in 1999, offers custom industrial electrical panels. Services and products are evaluated by scope and budget, and you can reach the team through the quote request page.

Frequently asked questions

What is the difference between an MCC and a QGBT?
A QGBT is the low voltage main switchboard that receives power from the transformers and distributes it to feeders. An MCC is a lineup of units dedicated to starting, protecting and controlling motors, and it is normally fed by the switchboard.
Do I always need an e-house?
No. An e-house makes sense when you want to concentrate switchgear, MCCs and control equipment in a protected room, built and tested in a factory. For smaller or simpler installations, panels in an existing electrical room may be enough.
Is an automation panel the same as a control panel?
Not exactly. A control panel usually commands devices with relays and hardwired logic, while an automation panel runs programmable logic through a PLC and exchanges data over networks. Many plants use both, sometimes in the same enclosure.
Which standards apply to industrial panels?
It depends on voltage level, country and application. Common references include ABNT NBR 5410 and ABNT NBR 14039 for installations, the IEC 61439 series for low voltage assemblies and NR 10 for work safety in Brazil. Always check the current edition.
What documents should I receive with a panel?
At minimum you should expect the single-line diagram, schematics, layout drawings, bill of materials, test records and a revised as-built set. The as-built documentation guide details what the pack includes.