Case study / Usina Pedra Buriti

Pedra Buriti — Turnkey Boiler and Cogeneration

Greenfield

Pedra Buriti Plant - turnkey boiler and cogeneration system with electromechanical assembly and commissioning by Authomathika
Mato Grosso do Sul200912 monthsSugar & Ethanol

01 / Usina Pedra Buriti

The challenge

The Pedra Buriti Plant needed to expand its cogeneration capacity with the deployment of a new boiler system. The challenge involved complete electromechanical assembly in parallel with the plant's existing operation, requiring rigorous safety management and interface control.

02 / Authomathika

The solution

Authomathika executed the complete boiler and cogeneration system assembly, including all electrical work, automation with PLCs for combustion and steam control, field instrumentation and commissioning with performance validation. Integration with the existing system was achieved with zero impact on operations.

Results

Scope
Boiler + cogeneration
Integration
Zero impact on operations
Safety
Zero accidents