Case study
Mannesmamm — New Boiler Installation
Mannesmamm — EPC

The challenge
Mannesmamm required a new boiler installation in São Paulo, with integrated automation, electrical and electromechanical assembly for a cogeneration system.
The solution
caseStudyData.mannesmamm.solution


